Removal from asbestos

 

 

 

Photos:

 

               

 

Technical data:

 

Surface: concrete
Contamination: asbestos
Thickness of contamination: 0,05 - 1 mm
Remarks:

non

 
Air pressure: 8 bar
Air flow: 7m³/ min
Water consumption: 100 liter per hour
Abrasive additions: non
Nozzle: G2
Result: twice faster than normal method